The demolition of the top and bottom redwood decks has begun. After the decks are gone, then the preliminary forms will be set so we can play with the size and shape of the decks and steps before permanent forms are made. It will probably be about a two week job (or so I estimate since our contractor Nar goes on vacation in two weeks!!). We also have to pick out the color of the cement that will be poured and the stamping that will be used. There will also be some electrical and plumbing work required, as well as new gutters and downspouts, and a sidewalk.